New: Second floor with ramp Added workshop pit gate 3 Features: – Completely revised design inside and out – Whole area passable inside and outside – Illuminated company logo – 9 gates that can all be opened and driven on – Second exit gate in the rear wall of the hall – Workshop: 3 ramps, 2 passable, 2 with random truck allocation – Workshop: workshop pit – driveway to the second floor – 5 parking spaces with random vehicles – New gas station – Automatic roller shutter at site entry / exit – Animated workers, guard and dogs – Sitting area with pictures and calendar – second floor with *Rolling gate entry-exit *Office with staff and conference room *Storage area for trucks and trailers *Panoramic view of the city Works with ATS 1.46 Credits: swini Credits: swini |